Infrastructure
Share Copy Link
HRADF unseals bidding offers for the Attica Road concession contract

Without objections from the concerned schemes the tender. The bids were unveiled by HRADF (upd)

Share Copy Link
A renovation from scratch in the Zografou Student Residence is in progress

The final studies and the implementation studies were prepared by the Alexandros S. Onassis Foundation and donated to NTUA.

Share Copy Link
The world's largest floating offshore wind farm officially opened

The wind farm consists of 11 wind turbines based on the floating Hywind concept, developed by Equinor.

Share Copy Link
Henry Holterman takes over the Corfu Palace

What does current owner, Mr. Fokas, noted in a farewell letter to the media.

Share Copy Link
The first seaplane arrived in Greece. The network of waterways is activated

The newly arrived aircraft is a CESSNA Caravan C208, of the American manufacturer TECHRON.

Share Copy Link
Kastelli airport works are being gradually delivered

The progress of construction works in Kastelli airport is remarkable.

Share Copy Link
  News Deals  |  Economy  |  Infrastructure  |  Greece
Techniki Olympiaki finalises deal with Intrum

The proposed price will amounts to €19,800,000.

Two big investors set foot in the so called "Athenian Riviera" beachfront

Municipality of Vari, Voula, Vouliagmeni in southern Attika had put up in auction 2 extended areas in Voula's beachfront.

Share Copy Link
World record HVDC subsea cables contract was awarded to Nexans

The EuroAsia Interconnector will exchange at Stage One 1,000 MW between Israel, Cyprus and Greece with Europe.