Infrastructure

The entire design and configuration has been assigned to the joint venture contractor Terna Energy - Indigital - Amco.

The concession period is 35 years, of which five years (60 months) are the design-construction period

The 4th generation technology park is financed with 33 million from the Recovery and Resilience Fund.